KM Labs Case Study

In summary:   

  • Over time, KM had grown into space on two floors that was not efficient for their operation
  • KM was on two floors which required them to move heavy and expensive laser equipment between floors
  • KM’s current building had a lot of “deferred maintenance” and it didn’t work well
  • Ultimately we ended up securing a 20,000 SF space in the tight Boulder market
  • KM will be 100% located on the ground floor, with greater efficiency and layout